Lviv communal enterprise Zelene Misto announced a tender for the development of project documentation within the stages of “feasibility study” and “project” for the construction of a waste processing plant.
The announcement is posted in the electronic procurement system “Prozorro”. The estimated cost of work is 4.7 million UAH.
“The concept of this complex is based on the idea of minimizing the volumes and residual volume of recycled wastes that will be sent for burial,” said Vadim Nozdrya, director of the Communist Party “Zelene Misto”.
According to his forecasts, the use of manual sorting options will reduce by 55% the volume of waste to be buried.
As reported, the Lviv City Council handed over the LCP “Green Misto” land on the street. Plastovoy, 13 for the construction of a complex for the processing of solid domestic waste (SDW).
Talks about the construction of a garbage recycling plant in Lviv have been going on for several years, but after the tragedy at the Gribovytsky training ground this issue again became urgent.
On September 1, the European Bank for Reconstruction and Development allocated 35 million euros for the construction of a garbage processing plant in Lviv. Of these, 10 million is a grant for the reclamation of the landfill in Gribovichi.
Another part of the money from the EBRD is intended for the construction of a garbage processing plant on the outskirts of Lviv. Utilize this money will be a utility company “Green Misto.”
In March 2017, Lviv signed a memorandum with the French company Egis, which is developing a technical task for the future of the garbage processing plant. In the terms of reference, the company should analyze the current situation, develop a strategy of behavior with solid domestic waste, and also calculate the estimate of the future plant. 650 thousand euros for the development of feasibility studies were provided by the French government.