{"id":4866,"date":"2018-07-26T18:43:18","date_gmt":"2018-07-26T18:43:18","guid":{"rendered":"http:\/\/polymers.com.ua\/?p=4866"},"modified":"2018-07-26T18:43:18","modified_gmt":"2018-07-26T18:43:18","slug":"%d0%ba%d0%b8%d0%b5%d0%b2%d1%81%d0%bf%d0%b5%d1%86%d1%82%d1%80%d0%b0%d0%bd%d1%81","status":"publish","type":"post","link":"https:\/\/polymers.com.ua\/en\/%d0%ba%d0%b8%d0%b5%d0%b2%d1%81%d0%bf%d0%b5%d1%86%d1%82%d1%80%d0%b0%d0%bd%d1%81\/","title":{"rendered":"KyivSpetsTrans wants to build a garbage processing plant in Kyiv"},"content":{"rendered":"<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-4867\" src=\"http:\/\/polymers.com.ua\/wp-content\/uploads\/2018\/07\/nJfZ9hyw-300x184.jpg\" alt=\"\" width=\"300\" height=\"184\" srcset=\"https:\/\/polymers.com.ua\/wp-content\/uploads\/2018\/07\/nJfZ9hyw-300x184.jpg 300w, https:\/\/polymers.com.ua\/wp-content\/uploads\/2018\/07\/nJfZ9hyw.jpg 734w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Kyivspetstrans is ready to build a garbage processing plant to meet the needs of Kiev and save the capital from a garbage collapse due to the closure of the 5th landfill.<br \/>\nThis on his Facebook page was reported by the head of the board of Kyivspetstrans, Andrei Grushinsky.<\/p>\n<p>Such a decision was made at the general meeting of shareholders of KP &#8220;Kyivspetstrans&#8221;.<\/p>\n<p>&#8220;I approached the KP shareholders about the need to build a garbage processing plant for the needs of the city of Kiev, and about 460,000 tons of garbage are taken annually by landfill No. 5. That is why the capacity of the new processing plant should be at least 400,000 tons of garbage a year. my appeal and decided to send a letter to the KSCA proposing the need to develop a project for the construction of a garbage processing plant with a minimum capacity of at least 400 thousand tons per year, &#8220;Grushinsky said.<\/p>\n<p>Recall, October 1, 2018 in accordance with the decision of the city council, the 5th polygon in Pidhirtsi should be closed and mothballed. The landfill in Pidhirtsi, where most of the garbage from Kiev is taken, has already been overfilled for several years, and the height of the garbage dump reaches the height of a 30-storey building. The problem polygon is twice as large as the Lvov Griboviches, and the capital can also have much more serious problems.<\/p>\n<p>According to Andrei Grushinsky, today the polygon functions in the working schedule, all the pumping and filtering equipment that serves lakes with infiltration works in a regular mode, no accidents or leaks of infiltration occurred. &#8220;Regarding the prospects of the landfill, I personally am sure there are not any alternatives to the construction of the plant, unfortunately, there is not enough time to solve the problem of dealing with Kyiv&#8217;s garbage.&#8221; Despite the holiday period, I hope for wisdom and prompt response of the city authorities to the proposal of Kyiv City Administration &#8221; &#8211; he noted.<\/p>\n<p>Earlier, Kiev environmentalist Vladimir Boreyko said that if there is political will such a plant can be put into operation in a few years. Until then, Kiev will have to agree on receiving waste with other landfills in the area (in the White Church or in Borispol).<\/p>\n<p>&#8220;For comparison, the plant in Tallinn processes up to 95% of the waste produced by the city, while our share of processing is only 2-3%,&#8221; Boreyko stressed.<\/p>","protected":false},"excerpt":{"rendered":"<p>Kyivspetstrans is ready to build a garbage processing plant to meet the needs of Kiev and save the capital from a garbage collapse due to the closure of the 5th landfill. This on his Facebook page was reported by the head of the board of Kyivspetstrans, Andrei Grushinsky. Such a decision was made at the [&#8230;]<\/p>\n<p><a class=\"btn btn-default vslmd-read-more-link\" href=\"https:\/\/polymers.com.ua\/en\/%d0%ba%d0%b8%d0%b5%d0%b2%d1%81%d0%bf%d0%b5%d1%86%d1%82%d1%80%d0%b0%d0%bd%d1%81\/\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/posts\/4866"}],"collection":[{"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/comments?post=4866"}],"version-history":[{"count":1,"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/posts\/4866\/revisions"}],"predecessor-version":[{"id":4868,"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/posts\/4866\/revisions\/4868"}],"wp:attachment":[{"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/media?parent=4866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/categories?post=4866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/polymers.com.ua\/en\/wp-json\/wp\/v2\/tags?post=4866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}